top of page

Project:  Design works of the site of KÁRPÁT Vasút Ltd. in Hatvan
November 2021 – ongoing 

 
Client: KÁRPÁT Vasút Ltd.


Short description of the project work: production of complete documentation suitable for construction of the site, obtaining the necessary permit, approval and consent for the construction, (design of 5 tracks - track with middle shaft, craned track, track with middle and sides, lathe track, storage track, design of vehicle repair hall and related infrastructure)

 

Disciplines: railway design, structural engineering (building engineering, statics), catenary design, spatial lighting, road construction, interlocking equipment, utilities


Design phases: Preparation of Permit Designs and Designs for Construction

​

Kárpátvasut.jpg

Project: Design of passenger facilities at missing railway stations and stations
Part 1: Preparation of licensing and construction plans and tender documentation for the passenger traffic facilities of Albertfalva station 
January 2022 – ongoing


Client: Ministry of Construction and Transport (legal successor of BFK Budapest Development Center Nonprofit Zrt.)

​

Short description of the project work: Integration of suburban rail transport into Budapest transport network by creating new, high-quality transfer facilities. Albertfalva station (connection to an existing pedestrian underpass, construction of elevators, platforms sk+55 cm high and 250 m long, construction of P+R, B+R and K+R car parks. Geographical examination of the railway station to be established, which includes the possibility of providing connections to road, pedestrian, cycling and urban public transport stops, as well as the Savoya Park shopping centre, the location of necessary modal change facilities (bus and tram stops, P+R, B+R, K+R) and carrying out a simplified CBA analysis to support the return on investment

​

Disciplines: railway track design, structural engineering (platform roof, statics), catenary design, spatial lighting, telecommunications, road construction, interlocking equipment, utilities, environmental planning, design of passenger facilities (platforms, underpasses)


Design phases: Pre-decision study, Feasibility study, Preparation of Permit Designs and Designs for Construction, Preliminary Environmental Study

Albertfalva.jpg

Project: Design of passenger facilities at missing railway stations and stations
Part 2: Preparation of licensing and construction plans and tender documentation for passenger traffic facilities at the new stations of the External Circular Railway
January 2022 – ongoing

​

Client: Ministry of Construction and Transport (legal successor of BFK Budapest Development Center Nonprofit Zrt.)


Short description of the project work: integration of suburban rail transport into Budapest transport network by creating new, high-quality transfer facilities:project involving 4 stops planning (Pestújhely, Újpalota, Rákosszentmihály, Rákosfalva) 

Disciplines: railway track design, structural engineering (platform roof, statics), catenary design, spatial lighting, telecommunications, road construction, interlocking equipment, utilities, environmental planning, design of passenger facilities (platforms, underpasses) Development of passenger traffic infrastructure, improvement of traffic safety, provision of barrier-free access (elevator, platform roofs, platform underpasses, B+R car park, relocation of tram stops, platform entrances, architectural solutions, island platform design, pedestrian walkway, bicycle path design)


Design phases: Pre-decision study, Feasibility study, Preparation of Permit Designs and Designs for Construction, Preliminary Environmental Study

Újpalota.jpg

Project: KÅ‘szeg-Szombathely electrification design 
May 2023 – ongoing

​

Client: GYSEV Zrt


Short description of the project work: , Carrying out demolition, site preparation, accessibility, utility and cable replacement works on the Szombathely – KÅ‘szeg railway line No. 18. Electrification of approximately 17 km of single-track branch line railway track on the existing alignment - to be finalised during the design process - in a 25 kV, 50 Hz single-phase system, to a permitted speed of 80 km/h. 

Modification of road crossing and interlocking equipment, modification and expansion of traffic control systems (KÖFE, KÖFI) to the necessary extent, planning of the construction of overhead contact line systems, spatial lighting, installation of a column transformer at KÅ‘szeg station. Environmental permit, certification.


Disciplines: geodesy, geotechnics, environmental protection work parts, certification, spatial lighting, interlocking equipment, traffic operation testing, track design, alternating heating, catenary design, high-current simulation, telecommunications, interference testing, passenger traffic modelling, cost-benefit analysis 


Design phases: Feasibility Study, Preparation of Permit Designs and Designs for Construction, Environmental Impact Assessment

DJI_0691.JPG

Project: Bajai BOKK track and cable substructure design
June 2022 – ongoing 

​

Client: LINERA Kft.


Short description of the project work: Preparation of the construction plans of the railway network of the Baja Public Port, redesign of the former existing railway network and the related infrastructure (access roads, parking lots, loaders, street lighting...). Extension of BOKK I, BOKK II tracks to the boundary of the port area, installation of gauge markers, sizing of buffer bollards, 

 

Disciplines: railway design, street lighting, telecommunications, road construction, interlocking equipment, utilities, 


Plan phases: Preparation of an implementation plan after project closure preparation of implementation plans

BAJA.jpg

Project: Zalaegerszeg station development Part 3 
September 2022 – ongoing


Client: Ministry of Construction and Transport
Short description of the project work: "Preparation of permit holder and construction plans in connection with the preparation of the renovations of railway and bus stations in Zalaegerszeg, in 4 parts"
Reconstruction of the space in front of the railway station (departing and arriving stations; storage; P+R; K+R, TAXI; B+R; MÁV-Volánbusz factory parking lot, etc.), interventions on Juhász Gyula Street and the related facilities of the railway station (establishment of a common rail-bus platform, making track I suitable for receiving trains, reconstruction of the associated platform to a height of SK +55 cm, development and accessibility of platform "B" between tracks II-III) /for cases without pedestrian underpass/

​

Disciplines: Geodesy, geotechnics, railway track design, spatial lighting, telecommunications, interlocking equipment, road design, traffic engineering, garden and landscape architecture, structural engineering, traffic operation testing, environmental protection, archaeology, certification

​

Design phases: complete permit design documentation; preliminary test documentation; environmental impact assessment; preliminary archaeological documentation; active participation in obtaining the necessary official permits for implementation; preparation of complete design documentation for all relevant disciplines; designer cost estimation; expropriation plan; preparation of amendments to town planning plans

Vasút05 5B0FEC4A.jpg

Project: Part 13 - "Reconstruction of the recording building and foyer of Balatonfenyves railway station and platform accessibility" -Preparation of supplementary and overlay plans for railway track plans (2022 March 2023 - ongoing

​

Client: HOMLOK Zrt.

​

Short description of the project work: Review of the railway track plans of the project won by HOMLOK Group, modification of plans, based on the needs and comments of the operator and the engineering organization. Verification of platform, plans for crossing points of light economic railways


Disciplines: railway track design


Design phases: Review and overlap (modification) of construction plans

Bfenyvesallomas.jpg
Hatvan
Albertflva
Körvasút
Szombarhely
Baja
ZEG
Bfenyves
bottom of page